If you use last year’s number to answer, “What’s the site security budget?” you might run into trouble. Risks go up when schedules get tighter, expensive deliveries arrive, or theft occurs.
Across North America, higher material costs, labor shortages, and new regulations are squeezing margins and schedules, which increases the risk of job-site losses.
Contractors are now looking closely at every budget line, including site security.
This article provides a step-by-step guide to building a jobsite security budget that addresses real challenges. You’ll find a risk-tier model to match spending to risk, phase-based line items, cost anchors you can explain, and packages ready for approval.
In this blog, we'll show you:
Why construction site security budgeting fails on most projects
- The “one flat monthly number” problem. A flat monthly budget doesn’t account for changing risk. At the start, there’s not much on site. Risk is highest in the middle of the project. Later, expensive items are easier to steal. Fixed budgets can cause early overspending or leave gaps in coverage when it’s most needed.
- Security protects your schedule and claims.
Many people view security as just another routine cost. Instead, think of it as protection for your construction schedule and insurance claims.
For example, a $5,000 camera system that prevents a $40,000 theft and delays pays for itself in one incident. According to OSHA, theft-related work stoppages vary by state due to investigation, insurance, and reordering.
- No triggers, no phase-based planning, no accountability.
If you don’t set triggers, plan by project phase, or assign clear responsibility, your security plan may not work as intended. If you don’t set escalation triggers, plan by project phase, or define clear roles, your security plan won’t be effective. Setting triggers for major deliveries, heavy equipment, or nearby crime helps you stay ahead rather than just react.
To address these problems, match your security budget to the real risks of your project. Use a tiered system based on asset value and site risk, and add coverage as needed. The next section explains a budget framework you can defend.
Here is a budgeting framework that contractors can trust
Now that you know the main issues, let’s look at a budgeting framework you can trust.
Step 1: Assign a risk tier (A / B / C)
Every project needs a specific security level. Assign a risk tier based on:
- Asset Value on-site: The total value of equipment and materials on site (projects exceeding $500K in staged value are considered higher risk).
- Assess the neighborhood crime rate: Using local police data for theft and vandalism incidents within a 1-mile radius. High incident rates elevate the risk tier.
- Review the number of access points and site visibility: Sites on corner lots with multiple street exposures face a higher risk than fenced sites with a single access point.
- Project duration: Longer jobs (12+ months) carry more exposure and may require a higher-risk tier than short projects.
- Proximity to quick resale markets: Urban sites near highways or scrap yards are more vulnerable to rapid theft and resale, increasing their risk tier.
Risk tiers
Tier A (High Risk): Sites in urban cores with high-value equipment, numerous access points, and proximity to high-crime areas. Examples are demolition projects in busy downtown districts, data center buildouts where valuable tools and electronics are frequently present, or utility infrastructure jobs near major public transit corridors, all of which attract opportunistic theft due to visibility and ease of access.
Tier B (Moderate Risk): Sites typically located in suburban or industrial areas with controlled access, moderate-value equipment, and standard construction schedules. For example, commercial warehouse builds or mid-rise apartment projects in developed suburbs, where the likelihood of theft is present but less pronounced than in urban cores.
Tier C (Lower Risk): Sites usually in rural or low-crime areas with single-access points, short project durations, and low-value assets. Examples include small municipal utility jobs or storage structure builds in low-population zones, where theft risk is minimal, and access is easily controlled.
Step 2: Budget by project phase
Security needs change as the project moves forward.
Mobilization (Weeks 1-4): The Federal Highway Administration suggests allocating 15–20% of project costs to mobilization, including perimeter setup and signage.
Peak Activity (Months 2-10): Allocate 50-60%. The highest risk occurs when the equipment and workforce are at peak.
Finishing (Final 2-3 months): Set aside 15-25% to protect finishes vulnerable to theft.
Demobilization (Final 2 weeks): Equipment removal, site cleanup. Lower risk, but still needs access control. Budget: 5-10% of total security.
Breaking your budget down by project phase helps you avoid spending too much at the start and scrambling for security at the end. This method saves money and keeps your project safer.
Step 3: Build the budget in layers
Picture security as three layers working together.
Layer 1: Perimeter and Access (Baseline)
Every site needs this basic layer.
- Temporary fencing: 6-8 ft high fence with privacy screening
- Access gates with locks
- Signage: No trespassing, video surveillance
- Access logs or keypad systems: For monitoring
Layer 2: Deterrence and Detection
This layer boosts visibility and helps collect evidence, depending on your risk tier.
- Lighting towers
- Mobile surveillance trailers (solar powered with cameras
- Fixed IP cameras (4-8 camera system)
- Monitored camera systems (24/7 remote monitoring with operator response
Layer 3: This layer provides an active response if deterrence does not work.
- On-site security guards (unarmed): Typical 12-hour overnight shift
- Mobile patrol services (scheduled drive-bys)
- Alarm systems with central station monitoring
- Incident reaction guidelines and escalation procedures: Administrative cost, typically rolled into monitoring contracts.
Step 4: After you set up the layers, fine-tune your spending by using cost anchors and return-on-investment data to back up your security budget.
According to NICB, one theft can cost $10,000–$30,000 in direct loss, not including delays. Monitored cameras often replace multiple guard shifts at a lower cost while providing evidence to support insurance claims. The construction theft costs $10,000-$50,000 in losses plus 2-4 days’ delay. If a monitored camera system costs $1,000/month, it pays for itself by stopping just one mid-range theft every 10 months. In 12 months, cameras pay off at Tier B sites; cameras plus patrols do at Tier A sites.
According to risk models cited by insurers, here are loss benchmarks you can use to support your budget:
- Annual theft losses at unprotected Tier A construction sites can range from $50,000 to $150,000.
- Individual incidents, such as equipment theft involving skid steers, generators, and welders, can cost between $15,000 and $75,000 per unit.
- Vandalism or arson may result in losses ranging from $20,000 to $100,000 or more, depending on the cost of materials, project delays, and insurance deductibles.
What goes into a construction site security budget?
Begin with this list, then adjust the amounts and timeframes based on your project’s tier and phase.
Perimeter & Access:
- Temporary fencing (linear feet × $/ft × duration)
- Access gates and locks
- Signage and notices
- Access control system (keypad, logs, or RFID)
Deterrence & Detection:
- Lighting (towers or fixed fixtures, rental, or purchase)
- Surveillance cameras (mobile trailers or fixed IP systems)
- 24/7 remote monitoring service
- Cloud storage for video retention (30-90 days)
Response & Administration:
- On-site security guards (hours per week × weeks)
- Mobile patrol services (visits per night × nights per month)
- Alarm system and central station monitoring.
- Incident reporting and escalation procedures
Trigger-Based Contingency (5-10% of total budget):
- Emergency response for a theft or vandalism incident
- Additional coverage during major equipment deliveries
- Escalation to armed guards or law enforcement coordination if neighborhood risk spikes
Construction site security packages that make approvals faster
(Figures used below are approximate based on market at time of publication, ROI calculations should be redone based on current market costs)
Good Package (Tier C / Lower-Risk Sites)
What you get:
- Perimeter fencing with locked gates.
- Basic signage
- LED lighting at entry points
- Access logs (manual or simple keypad)
Cost anchor: $1,500-$3,500/month, depending on site size and duration
Best for: Rural sites, short-duration projects, low on-site asset value
ROI logic: Covers liability and basic deterrence; meets most municipal code requirements.
Better Package (Tier B / Moderate-Risk Sites)
What you get:
- Everything in the Good package
- 4-6 fixed IP cameras covering high-value zones (equipment staging, material laydown, entry points)
- 24/7 remote monitoring with recorded video
- Mobile patrol service 2-3x per night
Cost anchor: $3,500-$7,000/month
Best for: Suburban industrial sites, standard timelines, moderate equipment value
ROI logic: Prevents $10K-$50 theft incidents; provides evidence for insurance claims; reduces schedule disruption.
Best Package (Tier A / High-Risk Sites)
What you get:
- Everything in the Better package
- On-site security guard during peak-risk hours (overnight or weekends)
- Advanced access control (RFID, biometric, or integrated gate systems)
- Alarm system with central station monitoring.
- Incident response protocol with law enforcement coordination
Cost anchor: $7,000-$15,000+/month depending on guard hours and site complexity
Best for: Urban core projects, high-value equipment, data centers, utility infrastructure, sites adjacent to high-crime areas
ROI logic: Protects $500K+ in on-site assets; prevents catastrophic loss events ($100K+ arson, copper theft); maintains schedule integrity on high-penalty contracts
Phase-based adjustment example:
A Tier A site might use the best package during peak activity (months 2-10), switch to the Better package during finishing (months 11-12), and go back to Good during demobilization. This approach can save 20-30% compared to using the best coverage for the whole project.
Construction site security budget implementation checklist
When presenting your security budget, focus on what you’re protecting, not just the costs. Here are some key points to include
- Schedule integrity: Every theft incident adds 2-4 days of delay. On a contract with $5,000/day liquidated damages, one prevented incident saves $10,000 to $20,000.
- Asset value: Peak on-site equipment and materials represent $X in replacement cost and Y weeks of procurement lead time.
- Insurance claims and premiums: A single central theft claim can increase your premiums 10-15% for 3-5 years. Proactive security reduces claim frequency.
- Reputation and future bids: Owners remember contractors who finish on time and avoid problems.
What we will not cut.
- Layer 1 (perimeter and access) is required. If you cut fencing or gates, you risk liability claims if someone enters the site and gets hurt.
- Compliance with local fencing, lighting, and signage ordinances. According to the New York City Department of Buildings, a Stop Work Order is issued when inspectors identify hazardous or unsafe work or conditions.
What triggers add-on spends?
- Major equipment deliveries (cranes, generators, HVAC units)
- Project phase changes (mobilization → peak activity → finishing)
- Neighborhood incidents (theft spike within 1-mile, adjacent site break-in)
- Owner-requested extended hours or weekend work that increases site vulnerability.
Implementation Checklist
☐ Assign project to risk tier (A/B/C) using scoring factors
☐ Break the security budget into four project phases
☐ Build a three-layer budget (perimeter, deterrence, response)
☐ Select Good/Better/Best package aligned with risk tier
☐ Define trigger-based escalation events
☐ Coordinate with insurance broker on coverage and claims mitigation
☐ Review municipal code requirements (fencing height, lighting, signage)
☐ Establish incident reporting and escalation protocol
☐ Schedule monthly security inspections during the peak activity phase
☐ Document all security measures for owner and insurer records
Conclusion
To build a strong jobsite security budget for 2026, you need more than a guess or last year’s numbers. Match your spending to real risks, break costs down by project phase, and show how the budget protects your schedule and claims, not just overhead.
The risk tier system, security packages, and phase-based line items give you a clear structure to plan your site security budget confidently.
As you plan your 2026 budgets, review your temporary fencing needs and partner with providers that can scale as you grow. Broadfence is a temporary fencing partner that understands site security and can support you with your project perimeter needs.
Request a quote today for temporary fencing solutions!
Please fill in the form below to subscribe to our newsletter and get these blogs directly to your inbox.
Sources:
- Federal Highway Administration (FHWA): Infrastructure Investment and Jobs Act program delivery and schedule implications. fhwa.dot.gov
- OSHA (Occupational Safety and Health Administration): Site security, access control, and lighting standards. osha.gov
- National Insurance Crime Bureau (NICB): Construction theft patterns, loss ranges, and incident cost data. nicb.org
- Dodge Construction Network: 2026 market outlook and demand forecasts. construction.com
- Statistics Canada: Construction sector employment, theft trends, and economic measurements. statcan.gc.ca
- Infrastructure Canada: Federal infrastructure funding pipeline and program timelines. infrastructure.gc.ca
- Canadian Construction Association (CCA): Labor market data and theft/vandalism survey results. cca-acc.com
- CSA Group: Canadian safety and security standards for construction sites. csagroup.org
- CCOHS (Canadian Centre for Occupational Health and Safety): Jobsite security and safety guidance. ccohs.ca
- New York City Department of Buildings: nyc.gov/site/buildings/index.page
- Sirix Monitoring: “How Much Does Construction Site Security Cost in 2025?” February 20, 2025. sirixmonitoring.com